Here is a selection of completed contracts that highlight the typical work we carry out. If any of the below projects are similar to those you are working on please contact us to discuss further.
Andrew Mill is a small development of 4 executive houses in Greenfield, Saddleworth. We started work on this challenging, sloping site in November 2016. Each house piled 8..
This detached house at Heckmondwike, West Yorkshire was built on a plot covered with several metres of filled ground right on the edge of a steep drop. The previous house..
Due to a slope failure in the rear garden of a house at Longhurst Lane, Marple Bridge the options to make the area useful were limited. Our solution was to install a piled..
On Manchester Rd, Greenfield in Saddleworth we were asked to provide the piled foundation for this 2 and 3 storey house on a steeply sloping site. We provided the full for..
We installed the piled foundation to this large detached new build house at Grasscroft, Oldham in December 2021. A total of 78 piles to 6m deep and 130 metres of concrete..
The lower ground foundations have now gone in for the fourth and final plot at Andrew Mill, Greenfield, Saddleworth. Most of the piles went in to 6 metres deep straight on..
We were asked to be involved in this extension on at farm at Barnoldswick that was to house a new swimming pool. The poor ground conditions mean't that piles were required..
The Brickworks is a new housing development in north Bury. We spent around 6 months on and off site starting in November 2017. The piled foundations we installed here were..
Much of the work that we carry out is on extensions to houses. Here is a small selection showing the different types and sizes of extension work we have carried out. take..
The piled foundations to this row of 4 town houses on Victoria St, Halifax took around 3 weeks to install. As can be seen from the photos this involved putting in the and..
This large detached house in Swinton was constructed using a timber frame. A total of 50 piles were installed to depths of just over 5 metres and together with the ground..
Due to poor ground conditions the new extension at Wilmslow Health Centre required a piled foundation. A total of 30 piles were installed to 7 metres deep together with 80..
READ OUR FAQS